翻訳と辞書
Words near each other
・ Stuttgart Stadtbahn
・ Stuttgart Trade Fair
・ Stuttgart University station
・ Stuttgart Valley Rollergirlz
・ Stuttgart Österfeld station
・ Stuttgart, Arkansas
・ Stuttgart, Kansas
・ Stuttgart-Bad Cannstatt station
・ Stuttgart-Bad Cannstatt–Aalen railway
・ Stuttgart-Degerloch water tower
・ Stuttgart-Feuerbach
・ Stuttgart-Feuerbach station
・ Stuttgart-Möhringen directional radio tower
・ Stuttgart-Obertürkheim station
・ Stuttgart-Rohr station
Stuttgart-Rohr–Filderstadt railway
・ Stuttgart-Untertürkheim station
・ Stuttgart-Untertürkheim–Kornwestheim railway
・ Stuttgart-Vaihingen station
・ Stuttgart-Weilimdorf
・ Stuttgart-Weilimdorf station
・ Stuttgart-Zuffenhausen station
・ Stuttgarter Hofbräu
・ Stuttgarter Hymnus-Chorknaben
・ Stuttgarter Kickers
・ Stuttgarter Kickers II
・ Stuttgarter Nachrichten
・ Stuttgarter RC
・ Stuttgarter Straßenbahnen
・ Stuttgarter Volksbank


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Stuttgart-Rohr–Filderstadt railway : ウィキペディア英語版
Stuttgart-Rohr–Filderstadt railway

|}
The Stuttgart-Rohr–Filderstadt line is an electrified, and mostly double-track line main railway in the German state of Baden-Württemberg. It branches in the Stuttgart district of Rohr from the Gäu Railway ((ドイツ語:Gäubahn)) and runs via Oberaichen, Leinfelden, Echterdingen and Stuttgart Airport to Bernhausen, a district of Filderstadt. It is now part of the Stuttgart S-Bahn.
==History ==
The Rohr–Echterdingen section was built as an unemployment relief project in 1920 by the Deutsche Reichsbahn (DR) to connect with the Stuttgart-Möhringen–Neuhausen auf den Fildern railway, that had been built by the private Filder Railway Company (''Filderbahn-Gesellschaft'') to create a better link with the DR network. The line was opened on 1 October 1920, with services running through to Neuhausen. This allowed passenger trains to run through without changing in Degerloch. Services from Echterdingen to Filderstadt were operated by Stuttgart Tramways (''Stuttgarter Straßenbahnen'', SSB) from 1920 and the Tramways took over the ownership of the line in 1934. In 1928 a branch line was opened from Leinfelden to Waldenbuch called the Siebenmühlen Valley Railway (''Siebenmühlentalbahn'') .
A track was laid in 1934 between Echterdingen and Bernhausen for the construction of the A8 and Stuttgart Airport. It was extended towards Denkendorf to take construction material along the autobahn as it was built and it also supplied construction materials and goods for the construction of the airport, which was completed in 1939. The route of the line was diverted to the east of Echterdingen station to Bernhausen in 1937 to run south of the airport area. The current S-Bahn route, however, largely follows the former construction siding.
In 1955, passenger services on the Stuttgart-Rohr–Echterdingen (–Neuhausen) line and on the Siebenmühlen Valley line were replaced by bus services; the line was now only used for freight traffic. The supplying of fuel and other goods to the airport by rail was abandoned by the end of the 1960s. At the same time the proposed Echterdingen link road was abandoned during the planning of the new Federal Highway 27 and the proposed use of the southern part of the military airport by the U.S. Army did not materialise due to community opposition. On 28 May 1983, freight traffic on the Leinfelden–Neuhausen section was closed and the tracks on the SSB-owned route from Echterdingen to Neuhausen were soon removed. The tracks on the Deutsche Bahn section from Leinfelden to Echterdingen were closed for rebuilding in preparation for the S-Bahn a few years later. The last train to run on the original line before the reopening for the S-Bahn was an Uerdingen railbus from Echterdingenran in September 1985 during a special trip for the inauguration of the S-Bahn to Stuttgart-Vaihingen. The remaining Rohr–Leinfelden section was still used occasionally for shunting freight until the early 1990s. It was used mainly to serve Leinfelden-based companies, but also for the transport of construction materials for the S-Bahn. The line was reconstructed for the S-Bahn from the mid-1980s, with the installation of double track, electrification and the partial undergrounding of the track. Curves were also straightened. A new line was created between Echterdingen and the airport.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Stuttgart-Rohr–Filderstadt railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.